construct
Posted on Sep 15, 2010
What delivery method is best for your project based on your comfort level between “Risk and Reward”? We offer multiple options of Construction Management so that you do not feel like you’re stuck with just one option:
.
.
.
.
Our Team serves in the role of the “lead” of the construction aspects of the project, in the same way most general contractors do, with the primary difference being that all vendor and trade contractor agreements are directly with the church…managed and led by comperio C3.
.
In this format, there is a Guaranteed Maximum Price (GMP). Our Team provides a GMP to the church prior to starting construction. This is usually provided after the permits have been obtained, but before the physical construction has ensued so that everyone is clear/transparent as to the maximum price based on the permitted scope of work.
.
This is also referred to as “Owner’s Rep” construction management. The reason it is referred to as “4th party” is that in this scenario, comperio C3 is the 4th party in the leadership team of the project in addition to the owner, architect and a general contractor.
.